All major tooling was constructed
in the U.S. with designer, Bob Barrow's approval and inspection.
He visits the plant periodically to inspect and help improve procedures.
As much of the fuselage as can be reached is welded in the fuselage jig
with only a small percentage remaining to be done when it is removed.
This controls welding distortion and provides maximum accuracy.
